Excavation Begins 6/25/2014

Excavating Pilings 7/9/2011

Excavating Pilings 7/9/2014

Pouring Concrete 7/28/2014

Piling 7/28/2014

Footing and Wall 8/6/2014

Footing and Wall 8/6/2014

Basement Wall Footing 8/11/2014

North/West wall concreting 8/22/2014

View from 87th Ave 8/29/2014
9/28/2014 Membrane Installed

9/28/2014 View from 87th Avenue